| Sampling Factors: |
Location: Programs based at the BWI campus follow slightly different processes from the Non BWI campuses
Customer (Not Relevant: Not relevant. No Standard process distinctions made based upon attributes of the customer.)
Size (Not Relevant: Not relevant. No Standard process distinctions made based upon size.)
Organizational Structure (Not Relevant: Not relevant. The Organizational Structure was analyzed and determined that it does not drive differences in how the work is performed.)
Type of Work (Not Relevant: Not relevant. No Standard process distinctions made based upon program type of work which includes production, product/development, internal research and development.) |
| Sampling Factor Values: |
BWI Projects (Location): Programs operating out of the Baltimore campus
Non BWI Projects (Location): Programs that are not operating out of the Baltimore campus |
| Subgroups: |
BWI Projects: Programs operating out of the Baltimore campus
762 People, 19 Basic Units
– BWI Projects
Non BWI Projects: Programs that are not operating out of the Baltimore campus
379 People, 12 Basic Units
– Non BWI Projects |