| Sampling Factors: |
Location (Not Relevant: All projects are developed in the OU premise and no specific tailoring is requested.)
Customer (Not Relevant: All projects are developed for similar customers and no specific tailoring is requested.)
Size (Not Relevant: Projects size is not affecting process tailoring.)
Organizational Structure (Not Relevant: All projects are developed having similar internal organization and no specific tailoring is requested.)
Type of Work: 1. projects in system 2. projects in platform |
| Sampling Factor Values: |
Projects in system (Type of Work): Projects required to be built into system and are required to developed as an independent system.
Projects in platform (Type of Work): Projects required to be built into platform and are required to developed as a subsystem which is needed to be integrated into an external platform |
| Subgroups: |
SG1: Projects required to be built into platform
36 People, 4 Basic Units
– Projects in system
SG2: Projects required to be built into platform
54 People, 5 Basic Units
– Projects in platform |