CMMI认证

Optimal Solutions & Technologies (OST, Inc.)-2019-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All Projects are managed from the same organization location)
Customer (Not Relevant: Organization does not differentiate processes to be followed based on customer domains)
Size: Possible differentiation in the implementation of Organization processes based on project size differences.
Organizational Structure (Not Relevant: All projects follow the same organization structure)
Type of Work (Not Relevant: No differences in the instantiation of the organizations process based on the type of projects)
Sampling Factor Values: OST_Large (Size): Projects that are more than 20 FTE in size
OST_Small (Size): Projects that are less than 20 FTE in size
Subgroups: OST_Large: Projects that are more than 20 FTE in size
70 People, 1 Basic Units
– OST_Large
OST_Small: Projects that are less than 20 FTE in size
29 People, 2 Basic Units
– OST_Small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Optimal Solutions & Technologies (OST, Inc.)-2019-CMMI3