| Sampling Factors: |
Location (Not Relevant: No effect. Projects and support groups at same location in Guangzhou)
Customer (Not Relevant: The products are developed as generic items. Currently no customer differentiation occurs.)
Size: Projects are either small or large and process differentiation occurs on the basis of size
Organizational Structure (Not Relevant: All projects are conducted within the one department (Consulting and Research Institute of Information System). There is no impact from organisational structure on project differentiation)
Type of Work (Not Relevant: All development activities are performed using the same development methodology) |
| Sampling Factor Values: |
Large (Size): greater than 15 staff
Small (Size): less than 15 staff |
| Subgroups: |
SG1: Less than 15 staff
14 People, 2 Basic Units
– Small
SG2: Greater than 15 staff
56 People, 2 Basic Units
– Large |