CMMI认证

Guangdong Power Grid Co Information Center-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All acq projects are managed and preformed by GPGCIC in the same location)
Customer (Not Relevant: Customers are the same)
Size: Size is defined by their internal processes by length. Large is longer than 6 months, Small is shorter than six months
Organizational Structure (Not Relevant: The org structure is the same for the projects)
Type of Work (Not Relevant: the type of work is the same type of Acquisitioin)
Sampling Factor Values: Small (Size): A Small sized project is defined as one that is shorted than 6 months
Large (Size): A large size is defined as one that is longer than 6 months
Subgroups: Subgroup 1: All projects in this subgroup are large size projects
12 People, 3 Basic Units
– Large

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Guangdong Power Grid Co Information Center-2013-CMMI3