| Sampling Factors: |
Location (Not Relevant: All work takes place from one location and the process does not change from project to project.)
Customer (Not Relevant: All customer projects use the Presidio processes and it does not change from customer to customer)
Size (Not Relevant: All projects use the Presidio process and it does not change by project size)
Organizational Structure (Not Relevant: There is one organizational structure within the OU, and the a single process is used)
Type of Work: All work is engineering work and the Presidio process is used to deliver that work |
| Sampling Factor Values: |
Engineering (Type of Work): Work performed by engineers and project managers
None (Type of Work): for SAS |
| Subgroups: |
Engineering Subgroup: Engineering Projects that deliver products using Presidio processes
93 People, 32 Basic Units
– Engineering |