CMMI认证

Programs Management Analytics and Technologies (PMAT)-C

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Process not impacted by location. Locations additional to San Diego are satellite offices to be near the customer.)
Customer (Not Relevant: All customers are DoD)
Size (Not Relevant: All projects are small)
Organizational Structure (Not Relevant: PMAT is by design a flat structure)
Type of Work (Not Relevant: Software development is the only type of work)
Entire OU: This sampling factor represents the entire OU
Sampling Factor Values: All Projects (Entire OU): This value results in the creation of a subgroup that contains all projects in the OU.
No projects (Entire OU): This is a Null value, and would result in no subgroup.
Subgroups: All Projects: This subgroup represents all development projects in the OU
18 People, 3 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Programs Management Analytics and Technologies (PMAT)-C