CMMI认证

QINGDAO SMART CITY INDUSTRIAL DEVELOPMENT CO.,LTD.-2018-CMMI

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: There is only one location)
Customer (Not Relevant: They work for the airline, there are no process distinctions made based on their customers.)
Size (Not Relevant: All project development projects have less than 15 employees, there are no process distinctions made based on the size of the project.)
Organizational Structure (Not Relevant: The organization structure is very simple, they share one management team, they use the same standard process, there are no process distinctions based on the organization structure.)
Type of Work: There are two types of work, one is Software Project, the other is the Integrated Project. There are some other notable implementations of some process area between Software Project and Integrated Project, such as RD, TS, PI, VER, VAL etc.
Sampling Factor Values: Software Project (Type of Work): There is only software project without hardware
Integrated Project (Type of Work): here is an integrated system which integrates software and hardware.
Subgroups: subgroup1: There is only software Project without hardware
12 People, 2 Basic Units
– Software Project
subgroup2: There is an integrated system which integrates software and hardware.
16 People, 2 Basic Units
– Integrated Project

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:QINGDAO SMART CITY INDUSTRIAL DEVELOPMENT CO.,LTD.-2018-CMMI