CMMI认证

Wabtec Railway Electronics-2013-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The OU is operating from one location only)
Customer (Not Relevant: The process followed is similar to all customers)
Size (Not Relevant: All products in OU are of medium size)
Organizational Structure: There are 3 products in the OU. They are IETMS, MRS and TBI
Type of Work (Not Relevant: All product projects are of development and maintenance in nature)
Sampling Factor Values: IETMS (Organizational Structure): Interoperable Electronic Train Management System
MRS (Organizational Structure): Product for MRS Logistica
TBI (Organizational Structure): Product – Throttle Brake Interface
Subgroups: WRE IETMS: IETMS product development and customization at Wabtec Railway Electronics, Cedar rapids
25 People, 1 Basic Units
– IETMS
WRE MRS: Product Development for MRS Logistica at WRE
10 People, 1 Basic Units
– MRS
WRE TBI: Internal product development – Throttle Brake Interface at WRE
9 People, 1 Basic Units
– TBI

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Wabtec Railway Electronics-2013-CMMI2