Robert Bosch Engineering and Business Solutions Ltd (RB

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Two locations Bangalore (BAN) and Coimbatore (COB)
Customer (Not Relevant: There is no customer specific process variation; currently all projects are for Bosch customers)
Size (Not Relevant: There is no size specific process variation. Currently projects are not classified into size buckets. Tiny projects are excluded)
Organizational Structure: Three practices (BSS, BSB, BSX)
Type of Work (Not Relevant: There is no work type specific process variation)
Sampling Factor Values: BAN (Location): Projects managed from Bangalore
COB (Location): Projects managed from Coimbatore
BSB (Organizational Structure): BSB Practice Unit
BSS (Organizational Structure): BSS practice unit
BSX (Organizational Structure): BSX Practice Unit
Subgroups: 1: BSS Practice in Bangalore
74 People, 5 Basic Units
– BAN
– BSS
2: BSS Practice in Coimbatore
59 People, 4 Basic Units
– BSS
– COB
3: BSB Practice in Bangalore
130 People, 5 Basic Units
– BAN
– BSB
4: BSB Practice in Coimbatore
125 People, 8 Basic Units
– BSB
– COB
5: BSX Practice in Bangalore
128 People, 11 Basic Units
– BAN
– BSX
6: BSX Practice in Coimbatore
25 People, 3 Basic Units
– BSX
– COB