CMMI认证

Shanghai Rongda Information Technology -2014-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are developed in the same city and therefore, location does not have an influence on process selection.)
Customer (Not Relevant: All customers” products are general health care and developed using the same process and therefore customer does not have an influence on process.)
Size (Not Relevant: The projects are all relative the same in size and therefore project size does not influence process selection.)
Organizational Structure (Not Relevant: All software are development by the companies” software development group and this does not influence process selection.)
Type of Work: Software is either approached iteratively or using the waterfall development life cycle model.
Sampling Factor Values: Iterative (Type of Work): Iterative life cycle model.
Waterfall (Type of Work): Waterfall life cycle model.
Subgroups: Iterative: Iterative life cycle method.
22 People, 3 Basic Units
– Iterative
Waterfall: Waterfall life cycle model.
13 People, 2 Basic Units
– Waterfall

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shanghai Rongda Information Technology -2014-CMMI3