CMMI认证

RSI / NESSA Internacional Operaciones-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: There are no different tasks for location.)
Customer (Not Relevant: All International Operations projects are developed from their offices so they are able to use their methodology. Sometimes the client ask to use theirs, but in this cases the PMO allows that only when it covers all the main points and if not the projects need to do a delta to cover with their methodology. That’s why we did not consider customer as a relevant sampling factor.)
Size: Two types of project based on size: Project (more than 100 person/days) and Taller (less or equal than 100 person/days).
Organizational Structure (Not Relevant: Organizational structure is not a relevant factor because is an organizational policy to use the same methodology to standardize the way all the organization works.)
Type of Work (Not Relevant: There is only one type of work software development.)
Sampling Factor Values: Full Life Cycle (Size): Projects with an estimated effort of 100 or more person / days
Reduced Life Cycle (Size): Projects with an estimated effort of less than 100 person / days
Subgroups: Full Life Cycle: Projects with an estimated effort of 100 or more person / days
30 People, 39 Basic Units
– Full Life Cycle
Reduced Life Cycle: Projects with an estimated effort of less than 100 person / days
23 People, 29 Basic Units
– Reduced Life Cycle

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:RSI / NESSA Internacional Operaciones-2017-CMMI3