Yunnan Ruixunda Communications Technology -2013-CMMI3

CMMI认证查询 cmmirz 8年前 (2013-09-29) 234次浏览 0个评论
Organization Name:
(组织名称)
Yunnan Ruixunda Communications Technology
Organizational Unit:
(组织单位)
Information & Technology Branch
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Sep 30, 2013
Lead Appraiser:
(主任评估师)
Rakesh Kumar Singh
Sponsor:
(发起人)
Zhou kunyan
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: As the organization and the OU are operating in a single unit, this is not a criteria for sampling.)
Customer (Not Relevant: Not Relevant: As the organization has multiple customers and have not organized their business based on Veritical for any particular domain or account, this is not considered as a sampling factor)
Size: As the project sizes differ and accordingly have a varied tailored process set for supporting their work products, this is considered as a sampling factor
Organizational Structure (Not Relevant: Not Relevant: Being a relatively small organization the organizational structure does help in being considered as a criteria for sampling)
Type of Work: As the kind of projects are differentiated as development and maintenance, these form a basis for sampling to provide a correct representation for the OU
Sampling Factor Values: Less than and equal to 5 (Size): Project team size less than and equal to five members.
Greater than 5 Team Members (Size): Project Team Size greater than 5 team members.
Development Type (Type of Work): Development type of full life cycle projects are considered in this section.
Enhancement Type (Type of Work): Enhancement type of projects which work on a partial life cycle models are considered in this section.
Maintenance Type (Type of Work): Bug fixing and production support type of projects are considered in this section.
Subgroups: BU-Dev: Development Type of Projects with full Life Cycle Methodology.
24 People, 2 Basic Units
– Greater than 5 Team Members
– Development Type
BU-Enh: Enhancement type of projects with partial life cycle methodology.
10 People, 2 Basic Units
– Enhancement Type
– Less than and equal to 5
BU-Mnt: Bug Fixing type of projects with production support and error routine checks methods are considered.
31 People, 2 Basic Units
– Maintenance Type
– Greater than 5 Team Members

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Yunnan Ruixunda Communications Technology -2013-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址