| Sampling Factors: |
Location (Not Relevant: Not relevant. The work is performed the same way no matter the location.)
Customer (Not Relevant: Not relevant. Work is performed same way)
Size: There are two types. Type A: over 360 man hours estimated resulting effort; Type B: less than 360 man hours estimated resulting effort. The effort is calculated based on the number of use cases and their complexity.
Organizational Structure (Not Relevant: Not relevant. Only one division serving all projects)
Type of Work (Not Relevant: Not relevant. All development projects are almost the same type of work)
Technology Base: The work is done differently if the software development technology base is different. Thechnolgy used is .net, JAVA, PHP. The architecture, CM, deployment are treated different. |
| Sampling Factor Values: |
Type A (Size): Resulting estimated effort over 360 MH. The effort is calculated based on the number of use cases and their complexity.
Type B (Size): Resulting estimated effort less than 360 MH. The effort is calculated based on the number of use cases and their complexity.
.Net (Technology Base): Software development using .NET technology
JAVA / PHP (Technology Base): Software development using JAVA or PHP technology |
| Subgroups: |
A .net: Software Development Projects Type A in .NET technology
40 People, 6 Basic Units
– Type A
– .Net
B .net: Software development projects type B in .NET technology
14 People, 2 Basic Units
– .Net
– Type B
A Java/PHP: Software development projects Type A in JAVA or PHP technology
22 People, 3 Basic Units
– JAVA / PHP
– Type A |