| Sampling Factors: |
Location (Not Relevant: Not relevant – All work of the organization is performed at the same geographical location)
Customer (Not Relevant: Not relevant – All customers for the organization are similar and have no impact on the standard process that the projects use)
Size: Relevant – There are small (>500 – <3000mh) and=”” large=”” projects=”” (=””>3000MH) within the organization
Organizational Structure (Not Relevant: Not relevant – The organization is organized under one general manager)
Type of Work: Relevant – There are different types of work performed in the organization. Development and Maintenance
|
| Sampling Factor Values: |
Small (Size): Small Projects = (>500 – <3000 total=””>
Large (Size): Large Projects = (>3000 Total MH)
Devlopment (Type of Work):
Maintenance (Type of Work): |
| Subgroups: |
S1: Small Maintenance Projects
12 People, 3 Basic Units
– Small
– Maintenance
S2: Small Development Projects
18 People, 3 Basic Units
– Small
– Devlopment
S3: Large Development
26 People, 1 Basic Units
– Devlopment
– Large |