- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Work is performed the same way no matter the location.)
Customer (Not Relevant: Work is performed same way no matter the Customer.)
Size (Not Relevant: Work is performed same way no matter the size.)
Organizational Structure (Not Relevant: Some people live in Colombia and some other in Chile. The project team is made up with people from either country. People carry out the process of the project (regardless of the country of residence to work).)
Type of Work: Maintenance and Implementation.Sampling Factor Values: Maintenance (Type of Work): Maintenance
Implementation (Type of Work): ImplementationSubgroups: S1-Maintenance: Keep the solution implemented in an implementation project in compliance with service levels and contract. A maintenance may be corrective and evolutionary according to the contractual terms.
51 People, 4 Basic Units
– Maintenance
S2-Implementation: The implementation of a project with a scope, time and cost limit, which can be an integration, customization and deployment services or products.
17 People, 4 Basic Units
– Implementation