CMMI认证

SATEC-2013-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Although work is performed in the same way in all locations included in the scope (Madrid and Avilés), this factor will be taken in account in the selection of basic units
Customer (Not Relevant: Work is performed in the same way for all customers)
Size (Not Relevant: Taking into account that only will be considered the projects with more than 40K € of budget, work is not performed differently based on the size of the project)
Organizational Structure (Not Relevant: Work is performed equal in all parts of the organizational structure)
Type of Work (Not Relevant: Work is performed in the same way for all kind of work (new projects and maintenances).)
Sampling Factor Values: Madrid (Location): Projects developed in Madrid
Avilés (Location): Projects developed in Avilés
Subgroups: Development-Madrid: Development and Maintenance Projects with the customer managed from Madrid
40 People, 15 Basic Units
– Madrid
Development-Aviles: Development and Maintenance Projects with the customer managed from Aviles
25 People, 15 Basic Units
– Avilés

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:SATEC-2013-CMMI2