Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is at the same location and performed according to the same procedures)
Customer (Not Relevant: All work is for the same type of customers and performed according to the same procedures)
Size (Not Relevant: All work is performed according to the same procedures regardless of project size)
Organizational Structure (Not Relevant: All work is performed according to the same procedures regardless of assigned work group)
Type of Work: Three different life cycle approaches
Sampling Factor Values: Waterfall (Type of Work): Projects that utilize a waterfall life cycle approach
Incremental (Type of Work): Projects that utilize an incremental life cycle approach
Agile (Type of Work): Projects that utilize an agile life cycle approach
Subgroups: Waterfall: Projects that follow a waterfall life cycle approach
40 People, 2 Basic Units
– Waterfall
Incremental: Projects that follow an incremental life cycle approach
54 People, 3 Basic Units
– Incremental
Agile: Projects that follow an agile life cycle approach
18 People, 1 Basic Units
– Agile

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:STM Savunma Teknolojileri Muhendislik ve Tic. A.S.-2013-CMMI