| Sampling Factors: |
Location (Not Relevant: It has one location and location has no impact on the way work is performed as the standard processes are followed. The sample covers 100% of the location. [Not Relevant].)
Customer (Not Relevant: It is not relevant, as Types of Customers have no impact on the way work is performed as the standard processes are followed. [Not Relevant].)
Size: There are two categories of the projects. The Large size is > 25 Technical Head Count Months (THCM) and Regular size is equal to or less than = or < 25=”” thmc).=”” although=”” all=”” processes=”” are=”” applied,=”” the=”” large=”” size=”” projects=”” may=”” follow=”” standard=”” sdlc=”” and=”” the=”” regular=”” size=”” projects=”” may=”” utilize=”” the=”” agile=”” development=”” life=”” cycle=”” per=”” tailoring=”” guidelines.=”” these=”” projects=”” are=”” performed=”” by=”” shared=”” resources=”” and=”” depend=”” on=”” the=”” size=”” of=”” the=”” project.=””>
Organizational Structure (Not Relevant: It is Not Relevant as Organization structure is same and has no impact on the way work is performed as the standard processes are followed. [Not Relevant].)
Type of Work (Not Relevant: Type of work has no impact on the way work is performed as the standard processes are followed so it is Not Relevant. [Not Relevant].) |
| Sampling Factor Values: |
Large Project (Size): This subgroup contains project that is of Large size of greater than > 25 Technical Head Count Months (THCM). Although all processes are applied, the Large size projects may follow standard SDLC per tailoring guidelines.
Regular Project (Size): This subgroup contains project that is of Regular size and is equal to or less than = or < 25=”” thmc).=”” although=”” all=”” processes=”” are=”” applied,=”” the=”” regular=”” size=”” projects=”” may=”” utilize=”” the=”” agile=”” development=”” life=”” cycle=”” per=”” tailoring=””> |
| Subgroups: |
Regular: This subgroup contains project that is of Regular size and is equal to or less than = or < 25=”” thmc).=”” although=”” all=”” processes=”” are=”” applied,=”” the=”” regular=”” size=”” projects=”” may=”” utilize=”” the=”” agile=”” development=”” life=”” cycle=”” per=”” tailoring=””>
6 People, 2 Basic Units
– Regular Project
Large: This subgroup contains project that is of Large size of greater than > 25 Technical Head Count Months (THCM). Although all processes are applied, the Large size projects may follow standard SDLC per tailoring guidelines.
5 People, 1 Basic Units
– Large Project |