CMMI认证

Shenzhen SECOM Technology Co., Ltd-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant. All projects are in the same location)
Customer (Not Relevant: Not Relevant. There are no notable difference in process implementation between different customers, because that the work contents are almost the same for all customers.)
Size: There are some difference in development process between small and large scale projects.
Organizational Structure (Not Relevant: Not Relevant. The organization has a unified structure and the same process set is implemented in development teams)
Type of Work (Not Relevant: Not Relevant. The same development methodology are used, and the projects of the company almost have similar type of work, there are no notable difference.)
Sampling Factor Values: large (Size): large size projects (FTE>=8).
small (Size): small size projects (FTE<>
Subgroups: sg-large: subgroup of large size (FTE>=8) projects
16 People, 1 Basic Units
– large
sg-small: subgroup of small size (FTE<8)>
12 People, 2 Basic Units
– small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shenzhen SECOM Technology Co., Ltd-2015-CMMI3