CMMI认证

Shandong Hengdao Info-2017-Tech Co., Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are in the same site.)
Customer (Not Relevant: All customer are the same type.)
Size (Not Relevant: All projects are the same size.)
Organizational Structure (Not Relevant: All projects are in the same department.)
Type of Work (Not Relevant: Type of work of all projects is development.)
Life Cycle: There are two life cycles.
Sampling Factor Values: L1 (Life Cycle): waterfall
L2 (Life Cycle): Iteration
Subgroups: Group1: waterfall
7 People, 1 Basic Units
– L1
Group2: Iteration
10 People, 1 Basic Units
– L2