CMMI认证

Shanghai Shentie Information Engineering Co.,Ltd.-2019-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Work is performed in the same site/facilities.)
Customer (Not Relevant: Work is performed in the same way regardless of the customer being served.)
Size (Not Relevant: Work is performed in the same manner, regardless of the size of the project, number of people or project duration.)
Organizational Structure (Not Relevant: Only the Applications Development Department projects will be appraised.)
Type of Work (Not Relevant: Only software development processes will be under scope.)
Entire OU: The Entire OU is the sample.
Sampling Factor Values: All Basic Units (Entire OU): A group that contains all the basic units in the Organizational Unit.
No Basic Units (Entire OU): An empty group with no basic units.
Subgroups: Railway System Projects: Develops and maintains systems used by the Shanghai Railway Bureau.
24 People, 3 Basic Units
– All Basic Units

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shanghai Shentie Information Engineering Co.,Ltd.-2019-CMMI3