Shenzhen Basepoint Intelligence Company Limited.-2017-CMMI3

CMMI认证查询 cmmirz 8年前 (2017-07-21) 727次浏览 0个评论
Organization Name:
(组织名称)
Shenzhen Basepoint Intelligence Company Limited.
Organizational Unit:
(组织单位)
Software Development Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jul 22, 2017
Lead Appraiser:
(主任评估师)
Mohammed Shareef Paloli
Sponsor:
(发起人)
Eryang Zeng
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Organization unit is operational from one location at Shenzhen, Guangdong Province, China PRC only and hence not considered to be relevant for sampling.)
Customer (Not Relevant: Organization unit serves commercial customers in China PRC and hence not considered to be relevant for sampling.)
Size: Size the basic units are classified as Medium sized (Effort: >500 persondays and < 1000=”” persondays,=”” duration:=””> 2 months and < 5=”” months)=”” and=”” large=”” sized=”” (effort:=””>1000 persondays, Duration: > 5 months) in the organizational unit and hence considered to be relevant for sampling.
Organizational Structure (Not Relevant: Organizational structure across all the basic units in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Type of Work: Software development life cycle (Waterfall, Waterfall + Prototype, Incremental) is different for all basic units, and developed in the similar technology (Dev Tool:Visual Studio 2012 ; Language and technology:.NET,asp.net MVC,js,kendoUI,entity framework ; Database: sql server2008R2) and hence considered relevant for sampling.
Sampling Factor Values: Medium (Size): Software development projects of Medium size (Effort: >500 persondays and < 1000=”” persondays,=”” duration:=””> 2 months and < 5=””>
Large (Size): Software development projects of Large size (Effort: >1000 persondays, Duration: > 5 months).
Incremental (Type of Work): Software development projects in incremental development life cycle model.
Waterfall (Type of Work): Software development projects in waterfall development life cycle model.
Waterfall + Prototype (Type of Work): Software development projects in waterfall + prototype development life cycle model.
Subgroups: SG # 1: Software development projects for commercial customers of medium size developed in Waterfall + Prototype life cycle using Dev Tool:Visual Studio 2012 ; Language and technology:.NET,asp.net MVC,js,kendoUI,entity framework ; Database:sql server2008R2.
11 People, 1 Basic Units
– Medium
– Waterfall + Prototype
SG # 2: Software development projects for commercial customers of medium size developed in Incremental life cycle using Dev Tool:Visual Studio 2012 ; Language and technology:.NET,asp.net MVC,js,kendoUI,entity framework ; Database:sql server2008R2.
10 People, 1 Basic Units
– Medium
– Incremental
SG # 3: Software development projects for commercial customers of large size developed in Waterfall life cycle using Dev Tool:Visual Studio 2012 ; Language and technology:.NET,asp.net MVC,js,kendoUI,entity framework ; Database:sql server2008R2.
11 People, 1 Basic Units
– Waterfall
– Large

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shenzhen Basepoint Intelligence Company Limited.-2017-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址