CMMI认证

Shenzhen Juding Medical Equipment Co., Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Organization unit is operational from one location at Shenzhen, Guangdong Province, China PRC only and hence not considered to be relevant for sampling.)
Customer (Not Relevant: Organization unit serves hospital customers in Shenzhen, Guangdong Province, China PRC and hence considered to be not relevant for sampling.)
Size: Size all the basic units are small (<3 months),=”” medium=”” (=””> 3 to < 6=”” months)=”” and=”” large=”” (=””> 6 months) sized in the organizational unit remains the same and hence not considered to be relevant for sampling.
Organizational Structure (Not Relevant: Organizational structure across all the basic units in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Type of Work: Software development lifecycle (Waterfall, Waterfall + Prototype) basic units are different across basic units, but developed in the same technology (MS and Java) and same domain (Healthcare) and hence considered relevant for sampling.
Sampling Factor Values: Small (Size): Software development projects of small size (less than 3 calendar months)
Medium (Size): Software development projects of medium size (> 3 to < 6=”” calendar=””>
Large (Size): Software development projects of large size (more than 6 calendar months).
Waterfall (Type of Work): Software development projects developed using Waterfall life cycle model.
Waterfall + Prototype (Type of Work): Software development projects developed using Waterfall + Prototype life cycle model.
Subgroups: SG # 1: Software development projects of small size developed using Waterfall life cycle model.
15 People, 1 Basic Units
– Small
– Waterfall
SG # 2: Software development projects of medium size developed using Waterfall life cycle model.
15 People, 1 Basic Units
– Waterfall
– Medium
SG # 3: Software development projects of medium size developed using Waterfall + Prototype life cycle model.
23 People, 1 Basic Units
– Medium
– Waterfall + Prototype
SG # 4: Software development projects of large size developed using Waterfall + Prototype life cycle model.
22 People, 1 Basic Units
– Waterfall + Prototype
– Large

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shenzhen Juding Medical Equipment Co., Ltd.-2017-CMMI3