| Sampling Factors: |
Location (Not Relevant: OU operates out of a single location)
Customer (Not Relevant: While customer category is relevant this is subsumed into the other sampling factor that has been chosen)
Size (Not Relevant: Project team size does not have significant variation.)
Organizational Structure (Not Relevant: While organizational structure is relevant this is subsumed into the other sampling factor that has been chosen)
Type of Work: There are two types of projects. Each of these project types is specific to a department and specific to a customer category. |
| Sampling Factor Values: |
Prd (Type of Work): This pertains to product development type of projects
Cst (Type of Work): This pertains to the custom development type of projects |
| Subgroups: |
Prd: These are the product development type of projects
24 People, 4 Basic Units
– Prd
Cst: These are custom development type of projects
30 People, 5 Basic Units
– Cst |