| Sampling Factors: |
Location (Not Relevant: Organization unit is operational from one location at Shijiazhuang, Hebei Province, China PRC only and hence not considered to be relevant for sampling.)
Customer (Not Relevant: Organization unit serves Enterprise customers in Shijiazhuang, Hebei Province, China PRC and hence considered to be relevant for sampling)
Size (Not Relevant: Size all the basic units are medium sized in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Organizational Structure (Not Relevant: Organizational structure across all the basic units in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Type of Work: Software development lifecycle (Waterfall, V-Model and Waterfall+Prototype) basic units are different across basic units, but developed in the same technology (C#) and same domain (e-Commerce) and hence considered relevant for sampling. |
| Sampling Factor Values: |
Waterfall (Type of Work): Software development projects developed using Waterfall life cycle model.
V-Model (Type of Work): Software development projects developed using V-Model life cycle model.
Waterfall & Prototype (Type of Work): Software development projects developed using Waterfall & Prototype life cycle model. |
| Subgroups: |
SG # 1: Software development projects developed using Waterfall life cycle model using C# technology.
8 People, 1 Basic Units
– Waterfall
SG # 2: Software development projects developed using V-Model life cycle model using C# technology.
8 People, 1 Basic Units
– V-Model
SG # 3: Software development projects developed using Waterfall & Prototype life cycle model using C# technology.
8 People, 1 Basic Units
– Waterfall & Prototype |