- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Work is perfomed in same location) Customer (Not Relevant: Work is performed only for 1 type of customer)
Size (Not Relevant: “All projects are managed for small size:
staff =>Organizational Structure (Not Relevant: Only technical department is the focus of the appraisal.)
Type of Work: “Some projects are Product Development,
Other projects are Product Maintanance.”Sampling Factor Values: PD (Type of Work): Product Development PM (Type of Work): Product Maintanance
Subgroups: New development: These type of product specializing in the supervision and management of steel structure processing plant detection and engineering site detection according to the relevant management requirements of Shenzhen construction engineering quality inspection center, as well as the specific work situation of departments engaged in steel structure detection.
4 People, 1 Basic Units
– PDSystem Upgrades: This type of project is to further integrate and get through the data and business between multiple systems, self-contained system, standard B2B2C E-commerce mall system that can provide connection to third-party platform commodity, order and inventory interface, park business management system, park personnel health and tourism customization system.
4 People, 1 Basic Units
– PM