CMMI认证

CECOM Software Engineering Center-2016-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed in one location – Aberdeen Proving Ground)
Customer (Not Relevant: All work is performed for the US Army.)
Size (Not Relevant: Regardless of size, all projects follow the same processes.)
Organizational Structure (Not Relevant: ARAT is a single organizational unit.)
Type of Work: Although all of the work performed by ARAT is sustainment, the work is divided into updating data sets (no real coding) and software development (writing or fixing code).
Sampling Factor Values: Updating Data Sets (Type of Work): Projects that update data sets rather than write software.
Software Development (Type of Work): Projects that write software to address change requests.
Subgroups: Updating Data Sets: Projects that update data sets rather than writing software.
81 People, 2 Basic Units
– Updating Data Sets
Software Development: Projects that write software to address change requests.
27 People, 3 Basic Units
– Software Development

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:CECOM Software Engineering Center-2016-CMMI2