| Sampling Factors: |
Location (Not Relevant: The work is performed the same way no matter the location)
Customer (Not Relevant: Work is performed same way no matter the customer)
Size: Projects are separated according to their size (small, medium, large)
Organizational Structure (Not Relevant: Only one division serving all projects)
Type of Work (Not Relevant: Software Factory is devoted to software development) |
| Sampling Factor Values: |
Small (Size): Small Projects (less than 150 hs)
Medium (Size): Medium Projects (150-300 hs)
Large (Size): Large Projects (greater than 300 hs) |
| Subgroups: |
S1: Small Projects
12 People, 4 Basic Units
– Small
S2: Medium Projects
14 People, 7 Basic Units
– Medium
S3: Large Projects
12 People, 5 Basic Units
– Large |