| Sampling Factors: |
Location (Not Relevant: Locations of the organizational unit sites have no impact on the way work is performed. The sample covers 100% of the locations.)
Customer (Not Relevant: The customers served by the organizational unit have no impact on the way work is performed.)
Size: The size of the products and services developed by the organizational unit has some impact on the way work is performed. These projects are performed by shared resources and depend on the size of the project. The Large size is of more than 30 Technical Head Count Months (THCM), and the Regular size is of less than 30 THCM. Fixes and Enhancement project size may adopt the abbreviated version of processes.
Organizational Structure (Not Relevant: The organizational structure of the organizational unit has no impact on the way work is performed.)
Type of Work (Not Relevant: The type of development undertaken by the organizational unit has no impact on the way work is performed.) |
| Sampling Factor Values: |
Large (Size): The Large size is more than 30 Technical Head Count Months (THCM).
Regular (Size): The Regular size is of less than 30 THCM. |
| Subgroups: |
Large Project: The Large size project is of more than 30 Technical Head Count Months (THCM).
16 People, 2 Basic Units
– Large
Regular: The Regular size project is of less than 30 THCM.
12 People, 2 Basic Units
– Regular |