CMMI认证

STM Savunma Teknolojileri Muhendislik ve Tic. A.S.-2019-CMMI

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is at the same location and performed according to the same procedures)
Customer (Not Relevant: All work is for the same type of customers and performed according to the same procedures)
Size (Not Relevant: All work is performed according to the same procedures regardless of project size)
Organizational Structure (Not Relevant: All work is performed according to the same procedures regardless of assigned work group)
Type of Work (Not Relevant: All work performed according to the same procedures regardless of type of work)
Life cycle approach: There are two different life cycle approaches that projects can follow
Sampling Factor Values: Waterfall (Life cycle approach): Waterfall life cycle approach
Incremental (Life cycle approach): Incremental life cycle approach
Subgroups: WF: Projects that follow a waterfall life cycle approach
53 People, 4 Basic Units
– Waterfall
I: Projects that follow an incremental life cycle approach
23 People, 2 Basic Units
– Incremental

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:STM Savunma Teknolojileri Muhendislik ve Tic. A.S.-2019-CMMI