Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All the projects are in the same location)
Customer (Not Relevant: All customers are external. The dedicated requirements of the customer are taken in account in the establishment of the defined project process (see Type of work))
Size: two types of sizes: big and small (size less than 300FP)
Organizational Structure (Not Relevant: All the projects are managed within R&D Dpt)
Type of Work (Not Relevant: Only the size of the project influences the project defined process indeed for all projects of the OU, the defined project process is based on a single list of potential sub processes. The selection of sub processes is made according to the wished optimization (workload, schedule, quality or dedicated requirements of the customers) & validated by simulation with Crystal Ball)
Sampling Factor Values: Big (Size): with size greater than 300FP
SMALL (Size): with size less than 300FP
Subgroups: BIG PROJECTS: greater than than 300FPs
30 People, 10 Basic Units
– Big
SMALL PROJECTS: less than 300 FP”s
24 People, 11 Basic Units
– SMALL