CMMI认证

Wuhan Stone Original Integration Co., Ltd.-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Only 1 location)
Customer (Not Relevant: Customer type (finance, electricity, government) does not change the process used)
Size: Project size (effort) does cause specific tailorings to occur, such as a) having a user spec or just customer interview records, b) having separate high- and low-level design or 1 design document, c) combining integration / system testing phases or keeping them separate.
Organizational Structure (Not Relevant: Only a project structure organizaion is used)
Type of Work (Not Relevant: The only work is the development of new products)
Sampling Factor Values: Less than 5 man-months (Size): Project effort is less than 5 man-months
More than 30 man-months (Size): Project effort is more than 30 man-months
Subgroups: Small: Projects that are less than 5-man-months
17 People, 4 Basic Units
– Less than 5 man-months
Large: Projects that are greater than 30-man-months
11 People, 1 Basic Units
– More than 30 man-months

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Wuhan Stone Original Integration Co., Ltd.-2013-CMMI3