CMMI认证

Suzhou Nuclear Power Research Institute Co., Ltd.-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The software development team is focused out of Shenzhen, P R China)
Customer (Not Relevant: All the systems are being developed for internal group organizations only)
Size (Not Relevant: The size of projects varied from 5 to 10 FTE and does not influence process implementation)
Organizational Structure (Not Relevant: All projects reports to Director)
Type of Work: Operations focused projects vs Reliability focused projects
Sampling Factor Values: Operations (Type of Work): Operations focused projects primarily work with equipment functions that needs to get feedback immediately and work on preventive, corrective maintenance activities. The typical activities are focused on short term turn around for the project.
Reliability (Type of Work): Reliability focused projects work on capturing of data and analysis leading to increasing reliability of various equipment. The typical activities are long term focused in the project.
Subgroups: Operations: Operations focused projects primarily work with equipment functions that needs to get feedback immediately and work on preventive, corrective maintenance activities. The typical activities are focused on short term turn around for the project.
15 People, 2 Basic Units
– Operations
Reliability: Reliability focused projects work on capturing of data and analysis leading to increasing reliability of various equipment. The typical activities are long term focused in the project.
20 People, 2 Basic Units
– Reliability

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Suzhou Nuclear Power Research Institute Co., Ltd.-2017-CMMI3