| Sampling Factors: |
Location (Not Relevant: Locations has no impact on the way work is performed as the standard processes are followed. [Not Relevant])
Customer (Not Relevant: It is not relevant as Types of customers have no impact on the way work is performed as the standard processes are followed.)
Size: Relevant. The Large size (> 50 Technical Head Count Months (THCM)) and Standard size is less than < 50=”” thmc).=”” these=”” projects=”” are=”” performed=”” by=”” shared=”” resources=”” and=”” depend=”” on=”” the=”” size=”” of=”” the=””>
Organizational Structure (Not Relevant: It is Not Relevant as Organization structure is same and has no impact on the way work is performed as the standard processes are followed.)
Type of Work (Not Relevant: Type of work has no impact on the way work is performed as the standard processes are followed so it is Not Relevant.) |
| Sampling Factor Values: |
Large Size (Size): Large projects are greater than > 50 THCM.
Standard size (Size): Standard projects are of less than < 50=””> |
| Subgroups: |
Large Projects: Large size is > 50 THCM
13 People, 2 Basic Units
– Large Size
Standard Projects: Standard project size is less than 50 THCM.
8 People, 2 Basic Units
– Standard size |