CMMI认证

Integrated Systems Inc.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location: Most projects are in the Washington DC metro area; however, one is based in Charleston, SC with IRS oversight coming from NC, NYC and WDC (Not Lanham).
Customer (Not Relevant: Although each customer tends to have its own preferences relating to details such as progress report formats, information, and frequency, the customer does not have a significant influence on how processes are implemented or performed within the organizational unit.)
Size (Not Relevant: Generally, process performance does not vary significantly as a function of project size.)
Organizational Structure (Not Relevant: The organizational unit has a relatively flat management structure. Therefore organizational structure does not cause significant variations in the performance of processes.)
Type of Work (Not Relevant: The organizational unit performs one type of work: product development and maintenance.)
Sampling Factor Values: Washington DC (Location): Projects conducted in the Washington, DC location
Charleston, SC (Location): Projects conducted in the Charleston, SC location
Subgroups: Washington DC: Projects conducted in the Washington, DC location
34 People, 6 Basic Units
– Washington DC
Charleston, SC: Projects conducted in the Charleston, SC location
7 People, 1 Basic Units
– Charleston, SC

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Integrated Systems Inc.-2015-CMMI3