CMMI认证

Chengde Taiyue Electronic Technology Engineering Co., L

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No process difference with project locations. One location.)
Customer (Not Relevant: No process difference with customers.)
Size: Practice implementation is different per project size.
Organizational Structure (Not Relevant: One organization structure. Same command chain.)
Type of Work (Not Relevant: No process difference with type of work. System and Software development.)
Sampling Factor Values: Large (Size): Project effort is greater than or equal to 24 person-months.
Small (Size): Project effort is less than 24 person-months.
Subgroups: SUB1: The subgroup of project of which size is large in effort. Project effort is greater than or equal to 24 person-months.
7 People, 1 Basic Units
– Large
SUB2: The subgroup of project of which size is small in effort. Project effort is less than 24 person-months.
13 People, 3 Basic Units
– Small

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Chengde Taiyue Electronic Technology Engineering Co., L