Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is managed out of the San Diego location, with the majority of the work being conducted in San Diego as well)
Customer (Not Relevant: All work for this OU is performed for the GSA and the USN. All projects follow organization’s standard process and the process is not influenced by customer)
Size (Not Relevant: All projects in OU are of medium in size. Size is not considered with determining which processes to follow)
Organizational Structure (Not Relevant: All project work is conducted using a similar organizational structure)
Type of Work (Not Relevant: All projects in OU are of software development and enhancements in nature. The process followed is same across type of work)
Methodology: Projects at TechFlow follow water fall and agile methods. The process followed is influenced by life cycle method. This will serve as a relevant sampling factor.
Sampling Factor Values: WF (Methodology): Projects under development, that are following waterfall methodology.
AG (Methodology): Projects under development, that are following agile and scrum methodology
Subgroups: TFWF: Subgroup consists of projects following waterfall life cycle
20 People, 2 Basic Units
– WF
TFAG: Subgroup consists of project following agile / scrum methods
30 People, 8 Basic Units
– AG