CMMI认证

Yusys Technologies Co Ltd-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are developed in the same city and therefore location does not have an influence on process selection.)
Customer: Development work is done in two ways. One is building a system for a specific Bank the other is developing a product or system that will then be sold potentially to various Bank.
Size (Not Relevant: All projects are developed are similar size that is between 30 – 50 KLOC and therefore does not infuence process election.)
Organizational Structure (Not Relevant: All software are development by the Development Department and this therefore does not influence process selection.)
Type of Work (Not Relevant: All projects follow the water fall development life cycle model.)
Sampling Factor Values: External (Customer): Projects and systems that are for a specific Bank.
Internal (Customer): Projects that develop systems/products that will be potentially sold to a number of Banks
Subgroups: External Projects: Projects that develop systems/solutions for a specific Bank
31 People, 4 Basic Units
– External
Internal Projects: Projects that develop systems/products for potential sale to multiple Banks
7 People, 1 Basic Units
– Internal

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Yusys Technologies Co Ltd-2015-CMMI3