CMMI认证

Weicheng Technology-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All Basic Units within the software department, perform their tasking at the Wuhan city site. As such, there are not differences in implementation in terms of location.)
Customer (Not Relevant: The customers are all commercial customers. There is no difference based on customer.)
Size (Not Relevant: The duration of the projects are 3 – 5 months. The range is not significant in how the projects perform the processes.)
Organizational Structure (Not Relevant: All the basic units fit within the same organizational department, software department.)
Type of Work: There are small differences in the process of the requirement confirmation between the two product types: Electrometrical Equipment management and Project Library management
Sampling Factor Values: Electromechanical Equipment Product Line (Type of Work): Electrometrical Equipment management requires customer to confirm each webpage of the system.
Project Library Mangement Product Line (Type of Work): Project Library management requires the customer to confirm on the final requirement specification document.
Subgroups: Electromechanical Equipment Product Line: Electrometrical Equipment management requires customer to confirm each webpage of the system.
8 People, 2 Basic Units
– Electromechanical Equipment Product Line
Project Library Mangement Product Line: Project Library management requires the customer to confirm on the final requirement specification document.
8 People, 2 Basic Units
– Project Library Mangement Product Line

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Weicheng Technology-2015-CMMI3