| Sampling Factors: |
Location (Not Relevant: All projects are developed in the same city and therefore location does not have an influence on process selection.)
Customer (Not Relevant: The customers are generic and therefore customer does not have an influence on process selection.)
Size: Smaller than 100 FPCs projects may have a different performance than larger than 100 FPCs projects.
Organizational Structure (Not Relevant: All software are development by the Software Development and this therefore does not influence process selection.)
Type of Work (Not Relevant: The project type of work is similar and this does not influence the process selection.) |
| Sampling Factor Values: |
>= 100 FPCs (Size): Development that is more or equal to 100 Function Point Counts in size.
< 100=””> (Size): Development that is smaller then 100 Function Point Counts in size. |
| Subgroups: |
>= 100 FPCs: Development greater then 100 Function Points
26 People, 3 Basic Units
– >= 100 FPCs
< 100=””>: Development smaller then 100 Function Points
16 People, 2 Basic Units
– < 100=””> |