| Sampling Factors: |
Location (Not Relevant: No effect. Projects and support groups at same location in Zhengzhou)
Customer (Not Relevant: The products are developed as generic items. Currently no customer differentiation occurs.)
Size (Not Relevant: All small sized projects and no process differentiation occurs on the basis of size)
Organizational Structure (Not Relevant: All projects are conducted within the one department (R&D Department). There is no impact from organisational structure on project differentiation)
Type of Work: Two development methodologies are used, Iterative and Waterfall |
| Sampling Factor Values: |
Waterfall (Type of Work): Waterfall Development methodology
Iterative (Type of Work): Iterative Development methodology |
| Subgroups: |
Waterfall: Waterfall Development methodology
4 People, 1 Basic Units
– Waterfall
Iterative: Iterative Development methodology
8 People, 2 Basic Units
– Iterative |