| Sampling Factors: |
Location (Not Relevant: There exists only one location for the system development center so there is no impact on how the projects are developed.)
Customer (Not Relevant: Regardless of the type of customer external or internal, processes are same. So there is no impact of process adoption.)
Size: Peta Byte (PB) (Large Size) projects are greater than >50 Technical Head Count Months (THCM). Giga Byte (GB) (Moderate Size) projects are than <50 thcm.=”” all=”” types=”” of=”” projects=”” follow=”” all=”” the=”” process=”” areas=”” according=”” to=”” process=”” descriptions=”” [thus=””>
Organizational Structure (Not Relevant: Support level is provided at company level per described processes so org structure does not impact the way work is performed. [Not Relevant].)
Type of Work (Not Relevant: Different type of work (PB (large) or GB (moderate)) does not affect processes utilization. [Not Relevant]) |
| Sampling Factor Values: |
PB Gropup (Large) (Size): This subgroup contains development projects that are greater than 50 Technical Head Count Months (THCM).
GB Group (Moderate) (Size): This subgroup contains development projects that are less than <50 technical=”” head=”” count=”” months=””> |
| Subgroups: |
PB Group: Peta Byte (PB) Group (Large Size) projects are greater than >50 Technical Head Count Months (THCM).
16 People, 2 Basic Units
– PB Gropup (Large)
GB Group: Giga Byte (GB) Group (Moderate Size) projects are than <50>
11 People, 2 Basic Units
– GB Group (Moderate) |