| Sampling Factors: |
Location (Not Relevant: Not relevant. All work is being done in same location.)
Customer (Not Relevant: Not relevant. No Standard processes distinctions made based upon attributes of the customer.)
Size: Projects are small (S), medium (M), or large (L) based upon program size which is defined as the number of FTEs. Small is 1 to 2 FTEs; Medium is 3 to10 FTEs; and Large is > than 10 FTEs.
Organizational Structure (Not Relevant: Not relevant. All projects are being performed within the same organization with a single process asset set.)
Type of Work (Not Relevant: Not relevant. No Standard processes distinctions made based upon program type of work. Types of work may include production, product/development, internal research and development.) |
| Sampling Factor Values: |
Small (Size): 1 to 2 FTEs
Medium (Size): 3 to10 FTEs
Large (Size): > than 10 FTEs |
| Subgroups: |
Small: Small projects use a particular set of process assets for some functions reflecting the scope
4 People, 3 Basic Units
– Small
Medium: Medium sized projects use the standard set of SCI process assets
8 People, 1 Basic Units
– Medium
Large: Large projects using the standard set of process assets
17 People, 1 Basic Units
– Large |