CMMI认证

Fundosa Technosite-2013-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects used the same Quality System independently of the location, size, customer or organizational structure.)
Customer (Not Relevant: All projects used the same Quality System independently of the location, size, customer or organizational structure.)
Size (Not Relevant: All projects used the same Quality System independently of the location, size, customer or organizational structure.)
Organizational Structure (Not Relevant: All projects used the same Quality System independently of the location, size, customer or organizational structure.)
Type of Work: The type of work is a sampling factor because the quality system describes different tools, methods and documentation to be used depending on the type of work.
Sampling Factor Values: Type 1 (Type of Work): Development, design and implementation of static Sites Web / Layout works of minor scope.
Type 2 (Type of Work): Development, design and implementation of static Sites Web / Layout works of major scope.
Type 3 (Type of Work): Maintenance projects.
Type 4 (Type of Work): Development of Web projects using reusable models.
Type 5 (Type of Work): Development of tailored web projects.
Type 6 (Type of Work): Development of management applications.
Subgroups: Type 1: Development of static web sites, or documents and templates layout works, with a minimun of 10 days of work and a maximum of 30 days of work.
39 People, 2 Basic Units
– Type 1
Type 2: Development of static web sites, or documents and templates layout works, with a minimum of 31 days of work.
39 People, 2 Basic Units
– Type 2
Type 3: Evolutionary and corrective maintenance of applications. Application layout on the basis of content standards, for publication in client’s property systems, with a minimum of 10 days of work.
39 People, 1 Basic Units
– Type 3
Type 4: Design, development and publication of web products on the basis of project templates or reusable project models, with a minimum of 20 days of work.
39 People, 3 Basic Units
– Type 4
Type 5: Design, development and publication of web projects based on content management engines, with a minimum of 40 days of work.
39 People, 1 Basic Units
– Type 5
Type 6: Design, development and publication of management products like balance scorecards and departmental management programs, with a minimum of 40 days of work.
39 People, 1 Basic Units
– Type 6

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Fundosa Technosite-2013-CMMI2