CMMI认证

Pro-2016-Sphere Tek-2016-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not relevant – single location)
Customer (Not Relevant: Not relevant – single customer)
Size (Not Relevant: Not relevant – same process used regardless of the project size)
Organizational Structure (Not Relevant: Not relevant – same process prformed in a flat organizational structure)
Type of Work (Not Relevant: Not relevant – same domain using the same processes)
Entire OU: All projects that deliver software
Sampling Factor Values: All Basic Units (Entire OU): All work is performed in the OU
No Basic Units (Entire OU): No Basic Units
Subgroups: Development Projects: All projects where Pro-Sphere Tek is prime, or where Pro-Sphere Tek controls the processes.
13 People, 2 Basic Units
– All Basic Units

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Pro-2016-Sphere Tek-2016-CMMI2