Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed at the same location following the same procedures.)
Customer (Not Relevant: All work is performed for the same government customer following the same procedures.)
Size (Not Relevant: All work is basically the same size and performed following the same procedures.)
Organizational Structure: There are Mission Systems projects and non-Mission Systems projects
Type of Work (Not Relevant: All work is of the same type and performed following the same procedures.)
Sampling Factor Values: Mission Systems (Organizational Structure): Projects within Mission Systems
Non-Mission Systems (Organizational Structure): Projects not in Mission Systems
Subgroups: MS: Mission Systems Group projects
183 People, 3 Basic Units
– Mission Systems