| Sampling Factors: |
Location (Not Relevant: All Henan Tenglong personnel are co-located in one location.)
Customer (Not Relevant: The development is for the same type of customer, so there are no customers that would influence the process implementation.)
Size (Not Relevant: Size of projects is not a factor that is incorporated into the tailoring process.)
Organizational Structure (Not Relevant: The organizational structure and processes are not a factor, as the standard processes are applied to the entire organization.)
Type of Work (Not Relevant: The work performed (software and systems) – all development and maintenance activities are similar, so there is no difference in the process implementation based on this factor.)
Duration: The duration of the project has an influence on the processes that are employed. The duration includes short and long projects. |
| Sampling Factor Values: |
Long (Duration): Long projects are more than 4 months in duration.
Short (Duration): Short projects are less than 4 months in duration. |
| Subgroups: |
Subgroup 1 – Long duration: The subgroup that contains long duration projects (more than 4 months). Includes the following project: Energy Data Acquisition System (EAS).
7 People, 1 Basic Units
– Long
Subgroup 2 – Short duration: The subgroup that contains short duration projects (less than 4 months). Includes the following projects: 1) Energy Operations Monitor (EOM), and 2) Anti Energy Theft System (AES).
11 People, 2 Basic Units
– Short |