CMMI认证

Tianjin Richsoft Electric Power Information Technology

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects are performed in one location in Tianjin.)
Customer (Not Relevant: All clients are in the electrical power sector.)
Size (Not Relevant: All projects are of the same order of magnitude in terms of size, as confirmed by the number of resources assigned to them.)
Organizational Structure (Not Relevant: Only one structure governs the development of new applications and upgrades to existing applications.)
Type of Work: New developments and upgrades are liable to be subject to process differences.
Sampling Factor Values: New Developments (Type of Work): Development of new electrical energy management applications.
Upgrades (Type of Work): Upgrades to existing electrical energy management applications.
Subgroups: SG1: Development of new applications in the field of electrical energy monitoring, control and management.
36 People, 3 Basic Units
– New Developments
SG2: Upgrades to existing applications in the field of electrical energy monitoring, control and management.
22 People, 2 Basic Units
– Upgrades

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Tianjin Richsoft Electric Power Information Technology