CMMI认证

HITT Traffic-2013-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is undertaken from the main office in Apeldoorn, The Netherlands.)
Customer (Not Relevant: The systems being delivered are very similar and to similar customers, mainly airport authorities. The work primarily involves the customisation/adaptation of a core product based on Product Deviation List.)
Size (Not Relevant: All work is typically the same size and any variations do not influence or change the processes used.)
Organizational Structure (Not Relevant: The organisational structure is flat with all work being undertaken in the same way and under the same management.)
Type of Work: Due to the nature of the product and similarity of the customers, there is virtually no process tailoring and all work is undertaken in the same way. However, the projects can involve the delivery of full new advanced surface movement guidance and control systems (A-SMGCS) or component replacement for the existing system.
Sampling Factor Values: New SMGCS (Type of Work): Delivery of new advanced surface movement guidance and control systems (A-SMGCS)
Replacement SMGCS (Type of Work): Delivery of replacement components of advanced surface movement guidance and control systems (A-SMGCS)
Subgroups: SG1: Delivery of an advanced surface movement guidance and control system (A-SMGCS)
12 People, 4 Basic Units
– New SMGCS
SG2: Replacement of surface movement guidance and control systems (A-SMGCS) components
4 People, 1 Basic Units
– Replacement SMGCS

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:HITT Traffic-2013-CMMI2